Office Relocation

Office Relocation

  • Good planning is vital! We conduct a pre-move check to evaluate ……
    • Broadband speeds and bandwidth into the office
    • Wifi signal requirements
    • Position and number of network ports
    • Ability to route network cabling out of site
    • Most efficient use of network routers, switches and cabling
    • Printers located in convenient and efficient locations
    • Efficient design of infrastructure to support growth or downsizing
    • Consultation of ‘Ethernet Over Power’ capability

 

  • Relocation can be undertaken outside of working hours
    • Resources available for evenings and weekends

 

  • Full installation capability including ……
    • Transportation of server and server rack
    • Server installation and set-up
    • Supply and fit of Ethernet switches adapters, and splitters
    • Installation of computer cabling, Cat5, 5e 6, or Fibre
    • Router installation and setup.

 

  • Conduct a Data Security audit of all connected devices ….
    • Ensure Antivirus software is up to date and running correctly
    • Check for Malware
    • Set up Firewalls
    • Ensure a Back Up policies are in place for valuable data

 

  • And on completion ….
    • Check full operation for all elements of the network
    • Training on the infrastructure setup for key users
    • Final program sign-off.

Here’s some easy steps to making sure the project gets off to a good start

and when you are ready for more detail.